
Etherlink 8.0 “Horus” proposal targets recoverable EVM aliases and Michelson fixes - eGamers.io
Etherlink 8.0, codenamed Horus, is the newest major upgrade proposal for the Etherlink kernel, jointly announced by Nomadic Labs, TriliTech and Functori, targeting recoverable EVM aliases and Michelson fixes.
With Etherlink 7.0 (Ganesha), the blockchain gained a second interface. Etherlink 8.0 focuses on making this two-interface chain safer and more predictable for existing users. The upgrade will not take effect unless Tezos L1 bakers approve it through a successful governance vote.
The primary change addresses how wallet addresses work. Every Tezos account has had an EVM alias since version 7.0—a 0x address representing the account on Etherlink's EVM interface. Previously, this alias was simply a hash of the Tezos address, meaning funds sent to it on other EVM chains were permanently lost.
Address Recovery System
Under Etherlink 8.0, each alias will be derived as the CREATE2 address of a smart-account contract deployed through the Safe singleton factory (0x914d7Fec6aaC8cd542e72Bca78B30650d45643d7). Each account type (tz1, tz2, tz3) gets its own contract embedding the account's public key hash.
The Safe factory exists at the same address on every chain that Safe supports, making aliases recoverable across chains. There will be no migration of existing aliases—old ones will continue forwarding tez but won't grant access to other assets.
Interface Improvements
The upgrade also introduces on-demand alias materialization on both interfaces without requiring initial cross-interface calls. The Michelson interface now includes gas refunds and error handling aligned with Tezos L1, making it more compatible with existing Tezos tooling.
Both changes make the interface easier to work with for users and for existing Tezos tooling.
Implementation Timeline
The teams intend to submit the Etherlink 8.0 proposal for Etherlink Mainnet via the slow track of the governance process on November 18, 2026. A separate post on Tezos Agora will provide voting instructions and exact voting periods.
Builders should test against the new derivation on Tezos X Previewnet, which already runs a release candidate of Etherlink 8.0. Node operators must upgrade to Octez EVM node version 0.68 before activation to avoid regressions.